
Summer 2009 has consisted mainly of painting, a task which sounds much simpler than it is. Don't get me started! If only the furniture, knick knacks and old wallpaper didn't have to be dealt with before the paint could go on!
•••••
There has also been some gardening, some cement mixed and poured, along with many rocks put in place to create an easy way to get from the terrace to the yard. Yesterday Jim pulled up almost all of the stone tiles that currently make up our driveway, which has really become a sad site, and we are waiting for a local guy to come by and give us an estimate on finishing the job. This, after Jim looked at the mess and concluded that this was a job for professionals!
•••••
There's still a mountain of tasks to complete to get our house ready to put on the market and get ourselves ready to move to a new domicile in late fall, early winter.
•••••
As for the lovely before and after view of the hall, that's only the front half of it and it took two days to complete. I still have the other half to do (behind the camera). Once that is done, the ground floor will be finished. Also, that brown-looking stuff on the walls, is some of that old wallpaper I was earlier growsing about having to remove.
•••••
Too bad there's also an upstairs, a basement and an attic to which much still needs to be done.
•••••
No comments:
Post a Comment